Council and Civil
Council Crossovers
Council crossover works for Melbourne properties, managed with attention to available documentation, access, surface removal, preparation and the relevant requirements for the site.
Request a Quote

Construction Scope
Defined around the site, intended use and finish.
Crossover removal and replacement, excavation, base works, formwork, placement, finishes, jointing and site reinstatement.
Planning Considerations
Council requirements differ by location and circumstance. Project documentation, approval requirements, services and existing levels should be confirmed before scheduling works.
How We Approach the Work
A considered sequence from preparation to completion.
01
Prepare
Review access, existing conditions, levels, drainage and the required construction build-up.
02
Form
Set the geometry, edges, levels, falls and formwork needed to define the concrete area.
03
Place
Place and finish concrete in line with the selected application, surface texture and project conditions.
04
Finish
Confirm joints, curing guidance, access timing and the expected care for the completed surface.
Questions to clarify before concrete is placed.
What affects the cost of a concrete project?
Do you remove existing concrete?
How are drainage and levels considered?
