Kerb and channel concrete works planned around falls, drainage direction, formwork accuracy, access and the applicable project specifications.
Request a Quote

Construction Scope
Defined around the site, intended use and finish.
Removal and preparation, base work, formwork, concrete placement, shaping, finishing, jointing and reinstatement to surrounding surfaces.
Planning Considerations
Drainage is central to kerb and channel work. Existing levels, pit locations, transitions, traffic management and approved drawings can shape the final scope.
How We Approach the Work
A considered sequence from preparation to completion.
01
Prepare
Review access, existing conditions, levels, drainage and the required construction build-up.
02
Form
Set the geometry, edges, levels, falls and formwork needed to define the concrete area.
03
Place
Place and finish concrete in line with the selected application, surface texture and project conditions.
04
Finish
Confirm joints, curing guidance, access timing and the expected care for the completed surface.
Questions to clarify before concrete is placed.
What affects the cost of a concrete project?
Do you remove existing concrete?
How are drainage and levels considered?